- Total cost $6,000,000 inclusive
of GST,
- Of the total cost the membrane
system was $2,500,000.
|
- Intake/
settling pond,
- Building,
- Membrane
system,
- Mech/Electrical
- Chlorine
system
- Standby
power,
- Clearwell,
- Residuals
ponds,
- Outside
piping,
- Engineering/Construction
Management
|