Greeley Creek Plant Capital Cost

  • Total cost $6,000,000 inclusive of GST,
     
  • Of the total cost the membrane system was $2,500,000.
  • Intake/ settling pond,
  • Building,
  • Membrane system,
  • Mech/Electrical
  • Chlorine system
  • Standby power,
  • Clearwell,
  • Residuals ponds,
  • Outside piping,
  • Engineering/Construction Management