The project includes installation of a new water line to loop Jordan Dr. and Burke Dr. to improve Fire flows in the area.
There will be minor water outages through out the project, please ensure on a daily basis that you have a container filled with water. Should there be any lengthy planned outages staff will notify you in advance.
During construction every effort will be made to minimize inconvenience to area residents.